Paul Hayne

Secondary Sawyer

Paul has been working at Albion Stone since 2004.

Paul will receive the detailed cutting instructions from the scheduling office and is responsible for ensuring that all stones produced from his saw are accurately cut and within the chosen geological characteristics set by the control panels or the contracts specific samples.

Paul works with